Love Island Summer
Overview
Transforming a rural Mallorcan villa into the glamorous home for the summer series of Love Island is a challenge due to the unique location and international aspects.

Client: Lifted Entertainment
Production Designer: Patrick Watson
Lighting Designer: James Tinsley
Transforming a rural Mallorcan villa into the glamorous home for the summer series of Love Island is a challenge due to the unique location and international aspects.

Client: Lifted Entertainment Production Designer: Patrick Watson Lighting Designer: James Tinsley
3350ft Scaffold Tube
1530 Scaffold Fittings
400m 30cm Truss
240 Steeldeck
160 Rigging Shifts
Task
Ensuring the appropriate equipment reaches the site for seamless installation poses a challenge for all international projects. However, leveraging our point cloud scanning services proved invaluable in overcoming this hurdle. By generating comprehensive 3D scans of the villa and its surrounding grounds, we could meticulously design all structures to precisely fit the venue before departing the UK.

Months prior to the initial build, we conducted thorough internal and external scans of the villa. Subsequently, utilizing our drawing packages within the point cloud, we designed the production structures. This approach allowed us to specify components accurately without any guesswork on site.

As a result, we effectively minimized unnecessary transport costs by only sending the required equipment.
Ensuring the appropriate equipment reaches the site for seamless installation poses a challenge for all international projects. However, leveraging our point cloud scanning services proved invaluable in overcoming this hurdle. By generating comprehensive 3D scans of the villa and its surrounding grounds, we could meticulously design all structures to precisely fit the venue before departing the UK.

Months prior to the initial build, we conducted thorough internal and external scans of the villa. Subsequently, utilizing our drawing packages within the point cloud, we designed the production structures. This approach allowed us to specify components accurately without any guesswork on site.

As a result, we effectively minimized unnecessary transport costs by only sending the required equipment.
22 0213 External V2024
Img20230424091415
Img20230427172811
Build
Following the planning phase, a complete team of riggers and scaffolders from Rigger embarked on a journey to Mallorca to commence the construction process.

Utilising the designs derived from the drawings created in the point cloud, minimal changes or alterations were necessary due to the meticulous planning and precision achieved during the initial stages.

This streamlined approach not only enabled us to significantly reduce the labor and effort required but also prevented any delays arising from unforeseen issues on site.
Following the planning phase, a complete team of riggers and scaffolders from Rigger embarked on a journey to Mallorca to commence the construction process.

Utilising the designs derived from the drawings created in the point cloud, minimal changes or alterations were necessary due to the meticulous planning and precision achieved during the initial stages.

This streamlined approach not only enabled us to significantly reduce the labor and effort required but also prevented any delays arising from unforeseen issues on site.
Img20230427172746 1